Simon Larson
Lead Project Engineer - Wastewater Solutions, Complete Filtration Resources
Simon, lead project wastewater engineer at Complete Filtration Resources, brings 15 years of process knowledge within the biological and membrane bioreactor space. He collaborates with clients to optimize a process for treatment of dairy industry wastewater, which each presents unique challenges. With a decade of experience treating some of the world’s most difficult wastewaters in the refinery and petrochemical sectors, he exercises an extensive toolbelt. His passion and enthusiasm for treating wastewater to the highest standards helps preserve our waterways and dependent ecosystems.
Ellsworth Cooperative Creamery located in Menomonie, WI will commission the beginning of 2022 a cheddar cheese production plant and a wastewater pretreatment facility. All the wastewater generated at the facility will pass through the anaerobic MBR pretreatment system before discharge to the city of Menomonie for final polishing. The anaerobic MBR utilizes tubular crossflow membranes to separate the biomass from the treated wastewater. The presentation will outline the overall treatment system, initial startup, steady state anaerobic MBR system performance and detailed membrane performance including permeability and fouling characteristics.